Skip to content

Education

Technical Education

J4350 and J6350 Hardware Installation and Configuration

About this Course

This Web-based training (WBT) is a self-paced course that describes the pre-installation, installation, hardware replacement, and initial configuration processes for the J4350 and J6350 services routers. It is designed to provide those who install or service the hardware with detailed demonstrations and technical information.

Objectives

On completing this course, you will be able to:

  • Specify preinstallation and configuration considerations for J4350 and J6350 services routers
  • Install, service, and complete initial configuration of the J4350 and J6350 services routers

Course Contents

    Section 1: Introduction
    Section 2: J4350 and J6350 Services Router Installation
  • Section Overview
  • Product Overview
  • Safety Measures
  • Tools and Components Required
  • Unpacking the Services Router
  • Installing the Services Router
  • Connecting the Interface Cables
  • Connecting AC Power
  • Connecting DC Power
  • Powering the Services Router On and Off
  • Connecting a Management PC for Initial Configuration
  • Performing Initial Configuration Though the J-Web Interface
  • Section Summary
  • Practice Activities
    Section 3: DRAM Module Replacement
  • Section Objectives
  • Tools and Parts Required
  • Removing and installing a DRAM Module
  • Section Summary
  • Practice Activities
    Section 4: Physical Interface Module (PIM) Installation
  • Section Objectives
  • Tools and Parts Required
  • Removing a PIM
  • Installing a PIM
  • Section Summary
  • Practice Activities
    Section 5: USB Storage Device Installation
  • Section Objectives
  • Tools and Parts Required
  • Removing the USB Storage Device
  • Installing the USB Storage Device
  • Section Summary
  • Practice Activities
    Section 6: Compact Flash Disk Replacement
  • Section Objectives
  • Tools and Parts Required
  • Removing and Installing the Compact Flash Disk
  • Section Summary
  • Practice Activities
    Section 7: Replacing the Air Filter
  • Section Objectives
  • Tools and Parts Required
  • Removing and Replacing the Air Filter
  • Section Summary
  • Practice Activities
    Section 8: Crypto-Accelerator Module Replacement
  • Section Objectives
  • Tools and Parts Required
  • Removing the Crypto-Accelerator Module
  • Installing the Crypto-Accelerator Module
  • Section Summary
  • Practice Activities
    Section 9: Power Supply Installation (J6350 Only)
  • Section Objectives
  • Tools and Parts Required
  • Removing the AC Power Supply
  • Installing the AC Power Supply
  • Removing the DC Power Supply
  • Installing the DC Power Supply
  • Section Summary
  • Practice Activities
    Section 10: Troubleshooting Hardware Components
  • Section Objectives
  • Chassis Alarm Conditions
  • Chassis Alarm Conditions and Corrective Actions
  • Section Summary
  • Practice Activities
    Section 11: Additional Information

Please provide us your feedback and suggestions by taking the course survey at http://survey.ccsurvey.com/junp0001a/survey1.pl.