Technical Education
J4350 and J6350 Hardware Installation and Configuration
About this Course
This Web-based training (WBT) is a self-paced course that describes the pre-installation, installation, hardware replacement, and initial configuration processes for the J4350 and J6350 services routers. It is designed to provide those who install or service the hardware with detailed demonstrations and technical information.
Objectives
On completing this course, you will be able to:
- Specify preinstallation and configuration considerations for J4350 and J6350 services routers
- Install, service, and complete initial configuration of the J4350 and J6350 services routers
Course Contents
- Section 1: Introduction
- Section 2: J4350 and J6350 Services Router Installation
- Section Overview
- Product Overview
- Safety Measures
- Tools and Components Required
- Unpacking the Services Router
- Installing the Services Router
- Connecting the Interface Cables
- Connecting AC Power
- Connecting DC Power
- Powering the Services Router On and Off
- Connecting a Management PC for Initial Configuration
- Performing Initial Configuration Though the J-Web Interface
- Section Summary
- Practice Activities
- Section 3: DRAM Module Replacement
- Section Objectives
- Tools and Parts Required
- Removing and installing a DRAM Module
- Section Summary
- Practice Activities
- Section 4: Physical Interface Module (PIM) Installation
- Section Objectives
- Tools and Parts Required
- Removing a PIM
- Installing a PIM
- Section Summary
- Practice Activities
- Section 5: USB Storage Device Installation
- Section Objectives
- Tools and Parts Required
- Removing the USB Storage Device
- Installing the USB Storage Device
- Section Summary
- Practice Activities
- Section 6: Compact Flash Disk Replacement
- Section Objectives
- Tools and Parts Required
- Removing and Installing the Compact Flash Disk
- Section Summary
- Practice Activities
- Section 7: Replacing the Air Filter
- Section Objectives
- Tools and Parts Required
- Removing and Replacing the Air Filter
- Section Summary
- Practice Activities
- Section 8: Crypto-Accelerator Module Replacement
- Section Objectives
- Tools and Parts Required
- Removing the Crypto-Accelerator Module
- Installing the Crypto-Accelerator Module
- Section Summary
- Practice Activities
- Section 9: Power Supply Installation (J6350 Only)
- Section Objectives
- Tools and Parts Required
- Removing the AC Power Supply
- Installing the AC Power Supply
- Removing the DC Power Supply
- Installing the DC Power Supply
- Section Summary
- Practice Activities
- Section 10: Troubleshooting Hardware Components
- Section Objectives
- Chassis Alarm Conditions
- Chassis Alarm Conditions and Corrective Actions
- Section Summary
- Practice Activities
- Section 11: Additional Information
Please provide us your feedback and suggestions by taking the course survey at http://survey.ccsurvey.com/junp0001a/survey1.pl.




