Configuration Tasks
Typically, you configure channelized or unchannelized modules in the following order. Some steps may not apply for a particular module.
- Set the parameters that provide basic identification and status information about the module.
- Set the line interface parameters.
- Set the DS1 interface parameters.
- Configure the DS0 bundle parameters. (See Chapter 14, Configuring DS0 Bundles.)
- Configure the:
- ATM interfaces (see Chapter 18, Configuring ATM)
- Bridged IP/1483 interfaces (see Chapter 20, Configuring Bridged IP)
- Cisco HDLC interfaces (see Chapter 23, Configuring Cisco HDLC)
- Frame Relay interfaces (see Chapter 24, Configuring Frame Relay)
- IP interfaces (see NMC-RX User Guide, Vol. 2, Chapter 6, Configuring IP)
- MLPPP bundles (see Chapter 25, Configuring MLPPP Bundles)
- PPP interfaces (see Chapter 27, Configuring PPP)
- PPPoE interfaces (see Chapter 28, Configuring PPP over Ethernet)